VIEW OF THE LANDSCAPING AROUND THE POOL LOOKING NORTH TOWARDS THE FUTURE 6 PLEX BUILDING.
VIEW OF DECK CONSTRUCTION. MAINTENANCE FREE COMPOSITE/VINYL DECKING, RAILING, POSTS, AND UNDERSIDE OF DECKS.
VIEW OF DOCK SYSTEM AND UPPER GAR LAKE FROM UPPER LEVEL DECK. SOUTH END OF POOL AND LANDSCAPING DURING CONSTRUCTION. ONE BOAT HOISTS SPACE IS AVAILABLE WITH PURCHASE OF ONE UNIT.
VIEW OF WEST SIDE OF 8 PLEX
VIEW OF POOL CONSTRUCTION AND DOCK SYSTEM
VIEW OF INFRASTRUCTURE AND LIFT STATION AT SOUTH END OF PROPERTY
VIEW OF LOW IMPACT DEVELOPMENT FEATURES AT SOUTHWEST END OF PROJECT
Our Development on Upper Gar Lake will showcase several Low Impact Development features throughout the property. This picture above shows the beginning stages of a retention swale/rain garden that is being constructed. This particular feature is a 6 foot deep trench that has been filled with different sizes of rock and gravel with drain tile running in and out of it from roofs and driveways. These areas will collect storm water runoff, filter it through the ground and permeate away naturally. There will be several of these retention swales installed throughout the property to prevent contaminated runoff from entering our valuable lakes.
VIEW OF DECKS FROM NORTH UNIT OF 8 PLEX
VIEW OF 8 PLEX FROM SOUTH END OF POOL